Wednesday, April 27, 2011
final review for art hotel project
Friday April 29 in Vogel Biosciences for the final project presentations of the Northern Pacific Railroad Depot adaptive re-use to art hotel, inspired by a regional artist.
photos by Logan Westom http://loganwestominteriordesign.wordpress.com/second-year/
Monday, March 28, 2011
Wednesday, March 2, 2011
Visit from Jennifer Paige of Rice Fergus Miller
Jennifer Paige (WSU'05) shared her design work experience with first and second year interior design students.
http://ricefergusmiller.blogspot.com/
Wednesday, February 2, 2011
[flexibility] Habitat for Humanity home designs
Washington State University Interior Design students in second year studio worked with members of the Palouse Habitat for Humanity (Brent Bradberry, Jennifer Wallace and Ken Hall) to provide home designs for future projects. Jim Vaux (PhD candidate, School of Architecture and Construction Management) also assisted in discussions of the interior ceiling form and impact on roof lines. We worked with the WSU Center for Civic Engagement to develop the collaboration.
Habitat for Humanity project included the following design parameters: Design a 1100 sq ft total interior living space that is fully wheelchair accessible, that includes one "great room" (kitchen/living area), three bedrooms, one full bathroom, a utility room w/air exchanger, water heater, and washer & dryer. To meet development covenants the home must include an attached garage and a covered entry porch.
Strategies to maximize energy-efficiency and sustainable construction practices should include: double exterior wall construction with studs 24”oc, energy trusses in the roof with an overhang of 2 feet, air-exchange system, shared plumbing walls, interior finish materials selected for durability, ease of installation and maintenance.
Habitat for Humanity project included the following design parameters: Design a 1100 sq ft total interior living space that is fully wheelchair accessible, that includes one "great room" (kitchen/living area), three bedrooms, one full bathroom, a utility room w/air exchanger, water heater, and washer & dryer. To meet development covenants the home must include an attached garage and a covered entry porch.
Strategies to maximize energy-efficiency and sustainable construction practices should include: double exterior wall construction with studs 24”oc, energy trusses in the roof with an overhang of 2 feet, air-exchange system, shared plumbing walls, interior finish materials selected for durability, ease of installation and maintenance.
Labels:
203studio,
Habitat for Humanity,
service-learning
Saturday, January 22, 2011
Monday, January 17, 2011
Subscribe to:
Posts (Atom)